WebD. For Flowable Fill see Section 03300. E. Submit Soil’s Compaction Reports (except Service Connection Contracts (AC, LC and SC) as follows: 1. Certified by Professional Engineer registered in State of Maryland. 2. Field Density Compaction Test Results. 3. Contract Number. 4. Soils Technician’s Name and Employer. 5. Test Number. 6. Date of ... Weban alternative to compacted fill. Terms used to describe this material include flowable fill, controlled density fill, flow-able mortar, plastic soil-cement, and soil-cement slurry. CLSM is a mixture intended to result in a compressive strength of 1200 psi (8.3 MPa) or less. Most CLSM applica-tions require unconfined compressive strengths of ...
FlowFill - Prairie
WebMay 7, 2024 · Flowable Fill . Backfill can also be done using flowable fill, a cementitious material with a low water-cement ratio that is delivered to the job site by a ready-mix truck. Typically, the utility pipe or other equipment … WebJul 1, 2013 · 1. Field Density Compaction Tests: Performed by a licensed Geotechnical Engineer following ASTM D1556, ASTM D6938, or ASTM D2937 at minimum rate of 1 test for every 100 feet of fill along main trench and at every lateral trench, structure and valve box in Type I areas. a. Test each lift to a minimum depth of 5.0 feet from the surface on … ion topalof
Graniterock: Technical Reports
WebCan be excavated - Flowable fill, having a compressive strength of less than 150 psi, is excavatable with conventional excavating equipment, yet is strong enough for most … WebApr 4, 2011 · 2.12.2 Select fill . 2.12.3 Flowable and cement-modified select fill . 2.12.4 Placement . 2.12.5 Compaction of select fill . 2.13 MINIMUM COVER FOR CONSTRUCTION EQUIPMENT AND ABNORMAL LOADS . 2.14 SHAPE TOLERANCES . 2.14.1 Monitoring of shape during placement of select fill . 2.14.2 Helically formed pipes … Webthick) of concrete or flowable fill in bottom of riser excavation and pipe trench. If water is a problem, contractor should use pumps and sumps to keep excavation dry. Undercut areas should be backfilled with compacted fill, concrete, or flowable fill, depending on type structure. Do require that the inspector be educated in pipe standards. on the hook food truck schedule montana